Cloud Migration & Modernization
Migration fails on detail: undocumented dependencies, legacy databases, tight change windows and no rollback path. Addicnet assesses before it moves, sequences the work, and supports you after cutover.
Migrate with a plan, not a leap.
What we hear from businesses like yours.
Unknown dependencies
Applications have grown around undocumented integrations and scheduled jobs. Moving one component breaks another.
Legacy constraints
Older databases, licensing arrangements and bespoke integrations do not map cleanly onto modern cloud patterns.
No rollback confidence
Without tested cutover and rollback plans, migrations are postponed indefinitely or attempted under pressure.
How Addicnet works.
Assess
We inventory applications, dependencies, data volumes and constraints, then classify each workload for rehost, replatform or retain.
Design and sequence
Target architecture, migration waves, cutover windows, rollback paths and success criteria are agreed before any production change.
Migrate and stabilise
Waves are executed with validation at each step, followed by a stabilisation period and documented handover.
What is included.
- Migration strategy and infrastructure assessment
- Application, database and server migration
- Rehost, replatform and modernisation planning
- Cutover, rollback and validation planning
- Data transfer and integrity verification
- Post-migration support and optimisation
Why it matters.
Lower migration risk
Sequenced waves with tested rollback paths replace a single high-stakes cutover.
Predictable timelines
Dependencies are surfaced during assessment, so plans reflect reality rather than optimism.
Modernisation where it pays
Effort is directed at workloads where replatforming or modernising produces measurable benefit, not applied uniformly.
How the engagement runs.
- 01
Consultation
A structured conversation about your environment, what is working, and where it is failing you.
- 02
Assessment
We review the estate, dependencies and constraints, then document what we found.
- 03
Proposal
Scope, responsibilities, service expectations and commercials, set out in writing.
- 04
Delivery
Work is sequenced and executed, then handed into managed operations where applicable.
Services that often sit alongside this one.
Questions we are asked.
How long does a migration take?
It depends entirely on scope. A single application can move in weeks; a multi-application estate with database dependencies is typically sequenced over months. The assessment produces a realistic, phased timeline.
Do we have to move everything at once?
No. Most engagements migrate in waves, keeping workloads where they are until their dependencies, cutover window and rollback path are fully understood.
Can you migrate to an African provider rather than a hyperscaler?
Yes. Target platform selection follows your latency, residency, cost and resilience requirements — we are not tied to a single provider.
Let's simplify your cloud infrastructure.
Tell us about your business and infrastructure requirements. Our team will assess your needs, recommend an approach and prepare a proposal.